Contracted vendor Hardy and Harper will perform street improvements within the Association after Memorial Day. The scope of work includes grinding of existing asphalt, paving and striping in specific areas.
Construction is scheduled to begin on Tuesday, 5/26/26. Work will be performed on weekdays from 8:00 A.M. to 5:30 P.M. Refer to signage placed by the vendor for specifics.
Stage 1 is Grinding beginning on Tuesday 5/26 completing on 5/27.
Stage 2 is Asphalt Paving following in each area on 5/27 through 5/29.
See the attached maps (2 maps in PDF linked below) for the affected streets.
Stage 3 is Speed Bumps and Striping. Speed bump work is happening on 6/1. Striping or painting the lines is 6/8 โ 6/9.
- Watch for signage directing traffic and indicating when the street will be open to traffic. Some streets will allow partial passage.
- Be advised that you will not be able to drive, bike, golf cart or walk on the streets while work is happening.ย ALERT YOUR TENANTS AND VENDORS OF SCHEDULE!
- If your streetย is affected, plan to move any vehicles that you will want to drive, out of the work area.ย Any vehicles left in work area may be subject to tow.
- Neighbors near to area, should park their vehicles on their driveways and in garages to free up on-street parking for those affected.
- Turn off irrigation, sump pump and construction run-off to affected streets.
- Do not drive or walk on the affected streets before they are released.ย You may track tar or debris onto your own driveway or garages.ย Any damage done to street seal coats before they are released, owner may be responsible for repair of damaged areas.
- Follow the signage and directions from our vendor.
See linked map for street work schedule. https://monarchbayhoa.com/wp-content/uploads/2026/05/Asphalt-Work-Map-5.2026.pdf